CASE STUDY OVERVIEW
Solar Farm Grid-Tie Substation
Electrical Dubai, UAE 2026 Emirates Renewable Energy
Engineering of a 132 kV grid-tie substation connecting a 200 MW solar farm to the national grid with advanced power conditioning.
The Engineering Challenge
Solar farm power fluctuations caused voltage flicker exceeding utility tolerance limits. Inverters struggled with grid impedance variations.
The Custom Solution
Integrated STATCOM units with our Titan Grid-Switch for dynamic reactive power compensation. Deployed a dedicated solar plant SCADA with irradiance forecasting.
Performance Outcome Metrics (KPIs)
THD< 1.5%
Power Export200 MW peak
Grid Stability100% compliant
Reactive Response< 5ms